Which item is typically the last step in the dry swale construction process?

Disable ads (and more) with a premium pass for a one time $4.99 payment

Prepare for the Stormwater Management Inspector Exam. Review with interactive practice questions, helpful hints, and detailed explanations. Ensure you're ready for success!

The last step in the dry swale construction process is the final inspection. This crucial step serves to ensure that all construction aspects have been implemented according to design specifications and regulatory requirements. During the inspection, a qualified inspector will assess the integrity of the swale, verify that it is functioning properly, and check for any potential water pooling or erosion issues that may arise.

Final inspections also provide an opportunity to confirm that all components, such as landscaping and any necessary maintenance practices, have been integrated correctly. This step ensures that the constructed swale can effectively manage stormwater, maintain water quality, and remain sustainable over time.

Other steps in the construction process, while important, occur prior to the final inspection. Landscaping is typically done before the final inspection to allow for establishment of the plants without hindrance. Excavation of pre-treatment cells and the installation of check dams are also integral parts of the construction process, carried out before the swale is ready for final assessment.